News detail
“Road Doctor” Works Well in Winter
Time:2020/02/12

Traditionally it is a common practice to take a long break in winter for the road maintenance industry, because of either the climate or technology issues.

 

“Road Doctor” cannot change the limitation of climate but it can enhance the technology to overcome the barrier. Here were cases of pavement resurfacing in November and December.



The key technology contents of “Road Doctor“ are:


1. Equipment with high adaptability to climate which exceeds the limitation of low temperature environment.


2. The work quality is related to the temperature of pavement heating, paving, compaction, and temperature uniformity. The combination of hot-in-place recycling units guarantees these critical parameters of maintenance work.


3. The cyclic heating method of hot-in-place technology minimizes the overheating and thus changing the properties of asphalt and affecting the durability after recycling.

 

The state-of-the-art technology breaks through the traditional restriction and keeps roads in a good condition in any seasons.

Relevance Information Recommendation
  • +moreFreetech Overview

    英达公路再生科技(集团)有限公司1993年成立于香港,多年来始终致力于沥青路面就地热再生技术...

  • +more发展历程

    2014年7月15日,英达公司在江苏南京六合经济开发区打造占地160亩设备制造基地和研发中心。

NO.9 Hengfei Road, Nanjing Economic&Technological Development Zone, Jiangsu, China

P.C.:210038 Tel: (86-25)85803030 Fax: (86-25)84861515

Freetech Hot-in-place Co.ltd Copyright © 2014 all rights reserved Su ICP for 10217671

(852) 2330 9600
About us
News
Business
Forum
Contact us